Technicians are currently performing hardware upgrades in UMD buildings. Hardware upgrades entail replacing all building switching and wireless access point equipment while maintaining the current network configuration. These upgrades require interruptions in wired and wireless networking while the work is performed. Outages are scheduled around peak building usage periods.
This upgrade process should result in very little, if any, disruption to users after the new hardware is installed.